One Public Budget

What your city plans to spend, taken straight from the document it published.

Where the capital money goes

Arcadia's Capital Improvement & Equipment Replacement Plan FY2025-2030 programmes $29,624,900 across 35 projects — new buildings, repaved streets, replaced water mains. This is the part of a budget you can see out of a window, so it is shown on a map.

Read the shapes carefully

The city's plan describes where each project is in words — a building's name, a street between two cross streets, a street address, or "Various Locations". It contains no coordinates at all. Every shape below was placed by One Public Budget by matching that text against public street and place data. The locations are our inference, not the city's data. Each one tells you how it was placed and how confident we are. Where we could not place a project, it is listed below the map rather than dropped or guessed at.

On the flat map, size is the place and shade is the money. Where a site has a real outline it is drawn as the shape that is really there — the buildings, the park, the street — so a big shape is a big place, not a big number. Where it does not, a plain marker circle of a fixed size says only "somewhere here". How dark a site is shaded is its combined cost. Where several projects landed at one place they are shown once, with the combined figure; the site's own page lists them separately.

14 projects with a location we could place

Starting the 3D view…

Buildings, by use

  • Homes
  • Shops, offices, hotels
  • Industrial, warehouses
  • Schools
  • Civic and public buildings
  • Use not recorded

Ground, by land use

  • Parks and green space
  • Sports and recreation
  • School grounds
  • Commercial areas
  • Industrial areas
  • Water

Capital projects

  • A project, its height its cost
  • Several at one site, stacked largest first

The ground itself

  • Slopes facing away from the light
  • Level ground
  • Slopes facing the light

The ground is Arcadia's real elevation, from 68 m at the south end to 1,260 m in the San Gabriel foothills at the north. Vertical scale is true — the hills are not exaggerated. Shading is a hillshade lit from the north‑west by map convention, so it shows which way a slope faces; it does not mean anything about the budget. Ground height is metres; column height is money. The two are different things in the same picture, which is why the columns are the only green and every one of them states its figure on hover.

Land use comes from OpenStreetMap and describes how land is observed to be used, not the city's legal zoning. Residential land is not shaded — it is most of Arcadia, and colouring it would drown everything else. Homes are still shown as buildings.

Buildings are drawn at heights from OpenStreetMap — 19,298 of Arcadia's 19,585 are tagged with a real height; the rest are drawn at one storey and say so when you hover. Each project is a green column, and its height is its cost — drawn as a share of the largest mapped project in the plan, so a column half as tall is a project costing about half as much. Hover any column for the exact figure and its percentage. Heights compare reliably only from a level or overhead angle: in a tilted view a nearer column looks taller than an equal one further away, and a tall one can hide a short one behind it. The figure floating above each column is rounded to two digits — $6M, $4.5M, $13K — as a signpost, not a source; hover for the exact amount. Where several projects share a site — the Library has three, City Hall has three — their columns are stacked, largest at the bottom, so the height of the whole stack is that site's combined cost and the label above it is that total. Each segment is one project: hover it for its own exact figure. The combined total is arithmetic by One Public Budget, which is why the label also says how many projects it covers. The table carries every figure in full, with no perspective at all.

Basemap: US Census Bureau TIGER/Line 2023 (public domain), © OpenStreetMap contributors (ODbL), and elevation from the USGS 3D Elevation Program (3DEP, public domain). Served from this site; no map tiles are fetched from anyone else.

Every site on the map

The same 7 places the map shades, as a table — so the combined figures the map shows exist in readable form and not only as colour. Sorted by combined cost, highest first.

Capital project sites with combined cost and the number of projects at each
Site Combined cost Projects Shading band
Arcadia Public Library $2,220,000 3 band 4 of 5 ($2,120,000–$3,850,000)
Arcadia Police Department $980,000 5 band 3 of 5 ($750,000–$2,120,000)
Arboretum Library; Arcadia Community Center $955,000 2 band 3 of 5 ($750,000–$2,120,000)
Arboretum Library; Arcadia Community Center $650,000 1 band 2 of 5 ($380,000–$750,000)
Arcadia Wilderness Park $550,000 2 band 2 of 5 ($380,000–$750,000)
Los Angeles County Public Works $30,000 1 band 1 of 5 (under $380,000)
Arcadia High School $13,000 1 band 1 of 5 (under $380,000)
Total across these sites $5,398,000 14

Site totals are arithmetic by One Public Budget over the figures the plan printed per project. A project that covers several locations is counted in full at each of them, never divided between them, so this total can exceed the sum of those projects.

Every mapped project

The same 14 projects, as a table. Sorted by amount.

Capital projects placed on the map, with amount, location text, and how the location was determined
Project Amount Location, as the city wrote it How we placed it
City Parking Lot Rehabilitation Program $1,240,000 Arcadia Public Library high confidence matched to Arcadia Public Library in OpenStreetMap
Library Facility Improvements $840,000 Arcadia Public Library high confidence matched to Arcadia Public Library in OpenStreetMap
Annual Replacement of HVAC Rooftop Units $650,000 Library, Public Works Service Center, and Community Center medium confidence the form names several sites; 2 of 3 were matched in OpenStreetMap (Arboretum Library, Arcadia Community Center)
Wilderness Park Debris Removal Design $450,000 Wilderness Park high confidence matched to Arcadia Wilderness Park in OpenStreetMap
Police Department Facility Improvements $440,000 Police Department high confidence matched to Arcadia Police Department in OpenStreetMap
Community Center Facility Improvements $305,000 Community Center high confidence matched to Arcadia Community Center in OpenStreetMap
City Hall Facility Improvements $150,000 City Hall high confidence matched to Arcadia City Hall in OpenStreetMap
Library Facility Improvements $140,000 Arcadia Public Library high confidence matched to Arcadia Public Library in OpenStreetMap
Police Department Facility Improvements $140,000 Police Department high confidence matched to Arcadia Police Department in OpenStreetMap
Upgrades to City Hall Green Room and Human Resources Offices $130,000 City Hall high confidence matched to Arcadia City Hall in OpenStreetMap
City Hall Facility Improvements $120,000 City Hall high confidence matched to Arcadia City Hall in OpenStreetMap
Wilderness Park Debris Wall Project $100,000 Wilderness Park high confidence matched to Arcadia Wilderness Park in OpenStreetMap
Wash Rack Drain Redesign Project $30,000 Public Works Yard medium confidence matched to Los Angeles County Public Works in OpenStreetMap
Arcadia High School Track Re-Striping $13,000 Arcadia High School high confidence matched to Arcadia High School in OpenStreetMap

12 projects the city describes as citywide

These are not missing from the map — they genuinely have no single place. Slurry sealing "various street locations", tree replacement "various locations". Putting a pin in the middle of town for these would invent a precision the city never claimed.

Citywide capital projects
ProjectAmountLocation, as the city wrote it
Annual Slurry Seal Program $6,950,000 Various Street Locations Within the City
Annual Slurry Seal Program $5,600,000 Various Street Locations Within the City
Pavement Rehabilitation Program $4,550,000 Various Street Locations within the City
Pavement Rehabilitation Program $3,550,000 Various Street Locations within the City
City Wide Interior Painting Project $700,000 Various City Locations
Green Light Pole Improvements $260,000 Various Street Lighting Districts
Annual Tree Removal and Replacement Program $250,000 Various Locations
Annual Tree Removal and Replacement Program $200,000 Various Locations
Fire Station Maintenance Program $125,000 All Fire Stations
Fire Station Maintenance Program $100,000 All Fire Stations
Citywide Art Preservation $29,800 Various Locations throughout the City of Arcadia
Citywide Art Preservation $26,100 Various Locations throughout the City of Arcadia

9 projects we could not place

This is our shortfall, not the city's. These projects name a real place — a fire station, a water plant, a stretch of alley — that our matching could not pin down. They are listed here in full so that money is never quietly missing from the picture.

Capital projects One Public Budget could not place on the map
ProjectAmountLocation, as the city wrote it
Fire Stations Facility Improvements $900,000 Fire Station 105, Fire Station 106, and Fire Station 107
Downtown Large Public Parking Lot Project $750,000 East of Santa Anita Ave, South of Wheeler Ave, and North of Citrus Alley
Fire Stations Facility Improvements $450,000 Fire Station 105, Fire Station 106, and Fire Station 107
Gilb Museum of Arcadia Heritage Facility Improvements $140,000 Gild Museum of Arcadia
Museum Education Center Facility Improvements $120,000 Museum Education Center
Veeder Root Project $100,000 Fire Station 105, Fire Station 107, Police Department, and PWSD Yard
Bollards Installation Project $40,000 Alta, Bonita and California east and west of First Ave.
Public Works Facility Improvements $26,000 Public Works Service Center
Dana Gym Entrance Keypad $10,000 Dana Gym

Download these projects (CSV)